Skip to content

Commercial facade waterproofing

Window perimeter and coated exterior wall on a commercial building

Trace wind-driven rain on a commercial facade before specifying sealing, preparation and access.

Visit to your property · 60 minutes

BEFORE WORK BEGINS

Understand the scope.

We inspect exposed wall sections, transitions, terminations and window perimeters. Loose material or cracks requiring a separate assessment are documented. The proposal identifies each elevation and how to coordinate work with building occupants.

  • Wall elevations and exposure
  • Windows and joints
  • Exterior access

A CLEAR FIRST STEP

From a consultation
to a plan for your property.

  1. 01

    Book your visit

    Choose a date and share the address and reason for your consultation.

  2. 02

    Review the surface

    The 60-minute visit provides time to discuss its condition and what you need.

  3. 03

    Define the next step

    Confirm preparation, materials, cost and terms before scheduling the work.

CUSTOMER EXPERIENCES

What our customers share.

Google Reviews

Google reviews will be available here soon.

CLEAR ANSWERS

Before you book.

Will treating the wall stop a window leak?

Only if the treated wall is the entry point. A failed perimeter joint, frame or flashing needs its own repair.

How is the cost determined?

Area, surface condition, preparation and the proposed system determine the scope. Book a consultation and confirm materials, price and terms in writing before work begins.

How do I book a consultation?

Select Book a consultation, choose an available date and time, and share the address and reason for the visit. The booking is for a 60-minute visit to your property.

YOUR PROPERTY. THE NEXT STEP.

Let’s start with a consultation.

Book a 60-minute visit. Share what you need and explore the next step for your property.

Book a consultation

CLOSE TO HOME

Find your town.

Local information across Puerto Rico. Confirm service coverage and availability before scheduling.